Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Jinguoyuan |
Model Number : | LKXG04-2008B |
Certification : | CE Certificate |
Price : | Negotiable |
Payment Terms : | T/T, D/P, L/C |
Supply Ability : | annual capacity of 5,000 Sets |
Delivery Time : | 30-45 business days after deposit received |
AI Revolution Pistachio Sorting Machine Separate 8 Grades in One Sorting
Product Introduction
The Future of Nut Grading: Pistachio Sorting Machine's AI Revolution
Step into the future of nut processing with the JGY Pistachio Sorting Machine, where artificial intelligence takes the lead. With 20 feed channels and 8 discharge ports, this machine is not just a sorter; it's a visionary. High-resolution cameras inspect each pistachio as the AI deep learning model works its magic, precisely categorizing them into eight grades. From black to kernels, the machine's intelligence ensures unparalleled accuracy. With a capacity of 600-700 nuts per minute, this is not just efficiency; it's a glimpse into the future of pistachio grading.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (kg/h) | 800-1100 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our nuts or not? Can
you send a process video?
A: We accept nut samples and manage videos conference during
testing, so you will have an obvious look at the effect to our
dates sorting equipment. In addition, your visit to our
manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after
contract signed and deposit received, namely after our proposal is
agreed to cater your actual demands.
![]() |